Van Asselt临时站点

Addition and Modernization of Historic Van Asselt School

A new classroom and gymnasium addition were constructed and connected to the landmarked schoolhouse. 这座四间教室的标志性建筑进行了翻新和现代化改造. The existing 1950s-era school building had some improvements to better serve as SPS’s southeast interim site.

建设阶段的图形显示学校处于开放阶段
了解每个项目阶段会发生什么

Timeline

  • 预设计阶段完成
  • 方案设计阶段完成
  • 设计开发阶段完成
  • 施工文件/许可阶段完成
  • 投标和授予阶段完成
  • 新增建筑和地标建筑开放
  • 现场照明项目- 2024年夏季

野外照明工程

Permitting is underway to add field lighting to the interim site to better serve the needs of 美世国际 Middle School, community use, 后来的学校设在凡·阿塞尔特学校. 安装计划于2024年夏季进行.

项目内容包括:

  • 四根70英尺高的镀锌钢灯杆.
  • Six floodlights on each pole include heavy shielding to minimize offsite glare and light spilling to neighboring areas.
  • 每根杆子上都有两盏联邦航空局的警示灯,将提醒空中交通注意这个位置.
  • Light levels will be IES Class 4, which is the minimum required for safe play on the field.

罗斯福高中的操场最近也安装了类似的系统.

灯杆的规划位置.

Now Open

Van Asselt临时场地现在是Mercer国际中学的所在地. 新建和翻新的地标建筑于2023年秋季完工.

进度照片档案

旧校舍
Existing 1909 Van Asselt School building – June 2022
a classroom with no ceiling panels and a scaffolding
Demolition of a classroom in the 1909 building – June 2022
有一个洞口的墙穿过它
Select demolition of Van Asselt School building – June 2022
工人们正在打磨框架中的混凝土
Footing for west retaining wall looking east – June 2022
aerial view of a large field with a building on one side and construction underway next to it
Aerial view of the project site with the existing school at the lower side and the landmarked building at an angle above it – Aug. 2022
a construction site next to an old two story building
新增加的布局- 8月. 2022
在老建筑旁边用白色材料围成的区域
教室大楼的蒸汽屏障- 8月. 2022
一栋三层历史悠久的校舍坐落在建筑活动中
Concrete pad and beginnings of structural steel for east side of classroom addition – Sept. 2022
混凝土基础安装了胶合木梁和结构钢
Glulam columns going up for west side of classroom addition – Sept. 2022
钢结构框架在混凝土之上,背景是一座建筑
Structural steel installation for the new gymnasium – Sept. 2022
胶合木梁在混凝土地板上,背景是钢结构
胶合木梁等待安装- 9月. 2022
a glulam column is being lifted into place by a crane
Glulam column installation for classroom addition – Sept. 2022
由钢和木头制成的建筑框架
结构钢和交叉层压木板安装- 9月. 2022
a cross-laminated timber panel rests on glulam wood framing
Cross-laminated timber (CLT) panel installation on top of glulam columns and beams – Sept. 2022
一座建筑正在建设中,背景是一座历史建筑
以地标建筑为背景的增建教室成型- 10月. 2022
a structural steel frame for a building with an existing building tarped off next to it
体育馆钢结构安装- 10月. 2022
wooden beams and decking of a partially built structure
Glulam columns and beams, plus cross-laminated timber panels – Oct. 2022
a building under construction with wood columns and decking
Glulam columns and beams with cross-laminated timber panels in classroom building – Oct. 2022
正在建造的建筑物的外部
教室外框及护套安装- 10月. 2022
interior of a building under construction with metal framing
Wall framing and interior rough-in underway for toilet rooms – Oct. 2022
a narrow room with wallboard and wallboard tape and mud on walls
教室增建电气室安装板岩- 10月. 2022
在未完工的房间中间有两层和四层楼梯的混凝土楼梯
Elevated stair landing in classroom addition – Oct. 2022
inside of a building with the wood framing showing and pink insulation in parts of it
Installing attic ductwork and insulation in 1909 building – Oct. 2022
aerial photo of a long building a playfield, an old building and a construction project
航拍照片显示整个校园,左侧是建筑工地. 2022
a two story building under construction with no exterior walls, wood beams, and interior metal studs
教室正在进行中,向西看- 11月. 2022
a larg metal roof with a playfield in the distrance
11月,体育馆的金属装饰完成. 2022
a 2 story building under construction with no walls
柱和梁到位,外部框架和护套开始- 11月. 2022
有金属钉和电线管道的在建建筑物的内部
Electrical rough in for a typical classroom teaching wall – Nov. 2022
aerial view of a construction project that wraps around an existing building with a playfield to the right
鸟瞰图- 12月. 2022
a large room with wood beams and a wood celing has unfinished walls and floor with a metal duct near the ceiling
Installing drywall and ductwork in classroom addition – Dec. 2022
屋顶上有黄色的盒子和栏杆
新健身房的天窗框架- 12月. 2022
粉红色的绝缘显示在金属钉和一些墙板之间
Installing insulation and drywall in addition – Dec. 2022
干墙被安装在一个有木梁和木天花板的房间里
干墙工作在教室增加- 12月. 2022
a part of a building with orange material wrapped around it
耐候性屏障安装- 12月. 2022
外墙有一扇窗户露在外面,其他窗户用木板封住了
1909年建筑的窗户模型. 2022
在建大型建筑物的天线, 右下角是另一座大楼, 还有一个绿色的草坪运动场
项目鸟瞰图- 1月. 2023
a 2-story building under construction with plastic draped over it - the walls are orange, 这里有Windows的空白处, and there is dirt and construction equipment in front
Looking south at the new classroom addition – Jan. 2023
a 2 story solid wall with yellow sheathing adjoins a perpendicular building under construction that is covered in plastic. dirt and construction equipment are in the foreground
Exterior sheathing in process at the gym addition – Jan. 2023
建筑内部:有高高的木质天花板的在建建筑物的内部, 木柱梁, and metal wall studs with wallboard on the upper part of the wall
Wall and door framing on floor 2 of the classroom addition – Jan. 2023
抬头望向木质天花板,天花板上有一条金属管道. openings in the wall for windows are empty, wallboard is painted
Painting, mass timber finishes, and ductwork in a classroom – Jan. 2023
一间大房间正在建造中,窗户用刨花板填充, scaffolding, and plastic; buckets, 粉色绝缘球棒, and other construction materials are in the middle of the room
Installing insulation in a 1909 building classroom – Jan. 2023
aerial of a long building with construction underway
2月项目鸟瞰图. 2023
一座橙色的两层楼
开始墙板系统安装- 2月. 2023
a long hallway with steel bracing and a wood ceiling
Painted wallboard, and finishes on mass timber and steel – Feb. 2023
a stairway wraps up two levels to the next floor
西楼梯就位- 2月. 2023
小壁橱里有瓷砖
单人卫生间瓷砖安装- 2月. 2023
aerial view of a new building wrapped around a historic building
项目视图- 2023年3月
a two story exterior wall has windows and dark metal panels
教学楼壁板系统和窗户安装- 2023年3月
a worker on a scissor lift is taping wallboard in a two story room
健身房墙板安装- 2023年3月
a ceiling with wood between tiles and large wood beams
Acoustic ceiling panels in the classroom addition – March 2023
走廊里闪亮的混凝土地板,用施工胶带粘住
2023年3月在教室附加走廊安装石膏地板
一个工人在一个大房间里安装橱柜和台面
2023年3月,教室加装橱柜和柜台
aerial of a buidling under construction with a playfield behind it
鸟瞰图- 2023年4月
一栋两层楼的建筑,一面有壁板和窗户,另一面没有
View of new building, looking south – April 2023
an unfinished courtyard area surrounded on three sides by a building under construction
Courtyard and new entry area with new building and landmarked building connected – April 2023
在一个大房间的天花板上悬挂着一个带透明背板的篮筐
Basketball hoop installed in gym addition – April 2023
a scoreboard is on a wall with a scissor lift in front of it
2023年4月,新健身房的计分板就位
a building with metal siding and windows on part and orange underlayment and plastic in the window openings on another part
展望南方——2023年5月
the corner of a two-story building has metal siding vertically in a dark color at the bottom and horizontally in a lighter color above
Corner of the classroom building, looking southeast – May 2023
a courtyard area has soil, gravel, and concrete walls. 工人们正在搬运材料. 前面是砾石压实机
2023年5月,庭院和新增教室入口的评分
在一间天花板很高的大房间里,一名工人正在为地板安装木板
Hardwood flooring installation in the new gym – May 2023
a trough sink with three faucets hangs on a tile wall with a few colored accent tiles
Plumbing fixtures in the new classroom building – May 2023
a room with windows on one wall and wood beams with a ceiling fan and partially installed light bars
教室大楼照明及吊扇安装- 2023年5月
一栋三层楼高的建筑,入口上方有尖顶屋顶,所有楼层都有窗户
Restored historic windows installed in 1909 building
教室左边的墙上有白板, 窗户在远处的墙上, 右边的墙上有一块黑板. the floor is covered with construction protection and a pile of material is in the middle of the floor
Updating the classrooms in the landmarked 1909 building – May 2023
aerial view of two buildings one at a 45 degree angle to the other. construction work is going on at the building exterior
鸟瞰图- 2023年6月
一栋两层楼的建筑有两部分,一部分更靠前,有棕色和奶油色的壁板, windows; the other is back and has orange underlayment and plastic over the window holes
Lookng south toward the new classroom wing – June 2023
a semi-circular low wall has gravel piled in the center; construction equipment and a building are behind it
安装挡土墙及评定中央庭院等级- 2023年6月
工人们正在一个高天花板的大房间里安装露天看台
看台安装- 2023年6月
一个壁龛有瓷砖墙,一个饮水机和一个水瓶加气站
管道装置包括水瓶加气站- 2023年6月
looking up toward the ceiling of a room that has glue lam beams and cross pieces of lighter colored wood - lighting fixtures are partially installed
教室照明及吊扇装置安装- 2023年6月
一个空房间的一面墙上挂着黑板, windows on another wall with radiators below them, 木地板
1909 building wood flooring restoration and acoustic ceiling tile installation – June 2023
a room with windows on two walls has duct work in the ceiling. some equipment and construction tools are on the concrete floor
1909建筑-学生储物柜区域的饰面和机械系统- 2023年6月
a three story historic building sits to the right with a new 2 story building directly in center with paved area in front of both
Landmarked building with the new addition – August 2023
a three story historic building is directly ahead with a circle drive in front - a new 2 story building is to the left and a low brick building is to the right
Addition, landmarked building, and 1950s building – August 2023
plants in pots sit on a soil area surrounded by concrete. 前面是铺着塑料的长凳
种植进行中- 2023年8月
一面墙上有露天看台的体育馆
体育馆扩建完成- 2023年8月
墙上的一扇窗户显示了一个小房间,里面有三把椅子、一张桌子和一个书架
Small group learning space in classroom addition – August 2023
教室的一侧有窗户, 天花板上的木梁, 在窗户对面有一个柜台,椅子和桌子堆放在中间
Typical 2nd floor classroom in the addition – August 2023
楼梯平台,上至二楼,下至一楼
Stairway in the classroom addition with cross-laminated timber beams showing – August 2023
a classroom with a wood floor and wood framed windows
Typical classroom in landmarked 1909 building – August 2023
舷梯:一侧开着门的平台. 楼梯通往楼梯口,又从楼梯口通往另一层
1909建筑楼梯和平台- 2023年8月
学校的鸟瞰图
1909年建筑的新增建筑和新健身房,右侧为1950年建筑. 2023
a classic schoolhouse with three floors and a covered entry
新主入口位于历史建筑左侧,面向西南. 2023
a circular driveway with two buildings in the background
New main entry, driveway, and landscaping – Sept. 2023
有桌子的教室
新楼典型教室- 9月. 2023
有篮球圈的健身房
体育馆扩建完成- 9月. 2023
一间有桌椅和白板的房间
1909年建筑典型教室- 9月. 2023

项目简介

The project at the original Van Asselt School adds a new classroom and gymnasium addition and renovates the historic landmark schoolhouse, 目前是空缺的. 该项目将在校园内提供30间新建或修复的教室. 这座建于20世纪50年代的单层校舍将保留下来,并进行了轻微的修改.

The two-story school addition will include 26 new classrooms, 新体育馆, 以及学生取得学业成功所需的支持和协作空间. The space will provide opportunities for schools to customize their environment and showcase their school spirit in their temporary home. The addition is carefully designed to honor the original 1909 building and connect seamlessly with the four existing classrooms.

Van Asselt场地被学区用作临时场地. Schools occupy the site as their temporary home during replacement or renovation of their permanent school building. Expanding the Van Asselt campus will provide more capacity and flexibility to house up to 1,000 students — either one middle school or two elementary schools — once construction is complete.

From Fall 2021 to Summer 2023, Kimball Elementary will occupy the main school building. In Fall 2023, 在新添加的内容完成之后, 美世国际 Middle School will move in for two years. 在此期间,一所新的替代学校将在美世网站上建立.

可持续建筑

The new addition will be built using engineered wood known as Cross Laminated Timber (CLT) for the floor panels and roof panels. These materials have carbon reduction and reduced greenhouse gas emissions over traditional steel and concrete. CLT材料使用可持续收获的木材产品(可再生资源).

Based on the Seattle School Board Green Energy Resolution, 新增建筑将不使用化石燃料,而是依靠电力供暖.

减少能源使用的特点:

  • 高效通风,在空气离开建筑物之前回收热量
  • 高度隔热的墙壁和屋顶
  • 节能LED照明

其他可持续设计策略:

  • Demolition and construction debris sorted and recycled
  • 屏蔽现场照明,减少光污染
  • Roof designed to accommodate future solar panels
  • 雨水管理与雨水花园
  • 本地抗旱植物

建设项目经理: shels Obletz Johnsen公司. (SOJ)

SOJ施工经理: Ethan Bernau, ethanb@sojsea.com, 206-838-3705

Designer: Bassetti建筑师

总承包商/施工经理: 基石总承建商

Budget: $50.3M

资金来源: Building Excellence V (BEX V) Capital Levy project, approved by Seattle voters in 2019.

Contact Us

Please send us your questions or comments using our 在线反馈表格.

原Van Asselt学校临时网站

灯塔大道7201号. S

西雅图,WA98108